In the first half of the week, I pumped up / transported several plasterboard and plans, as well as tidying up debris and rubbish plasterboard and insulation into skips and onto pallets.
Thursday 21 October 2021
I arrived at approximately 06:50.
I pumped up / transported a lot of plasterboard and planks at 25kg each with a colleague.
I took my first and only break at 11:00 for 30 minutes, which turned into 2 his. Whilst waiting for a delivery that was cancelled due to major traffic after an accident in the motorway.
I wiped down the top of skirting buses, window sills, plug sockets and light switches and hoovered up around the edges of each room of a 2 storey house after it was sanded down.
I left work at 15:00.
Friday 22 October 2021
I arrived at approximately 06:45.
I swept out a flat and a landing on the second floor of a block of flats.
I took my first break at 11:00.
I competed odd jobs until a colleague asked me to transport bags if quick sand and dust from a wooden pallet under a set of stairs of a block of flats. I helped my boss clear out rubbish plasterboard and metal, then I swept out the communal areas of a block of flats.
I transported 3 bags of dust from my boss' van to a house and transported a roll of insulation from the house to his van.
I had my time sheet filled out and signed, and I left with at 15:35.
An agency colleague let me know that the Recruitment Agency he uses does not deduct as much pay from individuals for things life the Recruitment Agency's National Insurance, etc., so I would get more money each week. I spoke to the Recruitment Agency he works for who were happy to take me on. I contracted my Recruitment Agency to infirm them that today was my last day, as I had found another job. They were hair with that.
On my way home, I received a call from the Recruitment Agency for my details and for them to send information over to my e-mail address for me to complete and return.
No comments:
Post a Comment